User Permissions for System Positions

User list including user names, designations and image is displayed.

Against each user, system positions permissions will be displayed.

You can also perform a keyword search to locate a specific user.

 

 

 

Copyright © 2014-2015 CAMMS Online Help. All rights reserved.

Last revised: November 26, 2017